Company news

Groundbreaking ceremony of road from Xuan Hung commune connecting with road from Tho Xuan town to Lam Son – Sao Vang urban area, Tho Xuan district

Groundbreaking ceremony of road from Xuan Hung commune connecting with road from Tho Xuan town to Lam Son – Sao Vang urban area, Tho Xuan district

On December 21, 2021, in Tho Xuan district, INVESTCORP Land Thanh Hoa Company Limited held the Groundbreaking ceremony of the road from Xuan Hung commune connecting with road from Tho Xuan town to Lam Son – Sao Vang urban area, Tho Xuan district.
Construction progress updated in December 2021 – Renovation and improvement project of Thanh Quang Park (historical site of lamp factory), Ba Dinh ward, Thanh Hoa city

Construction progress updated in December 2021 – Renovation and improvement project of Thanh Quang Park (historical site of lamp factory), Ba Dinh ward, Thanh Hoa city

At the end of December 2021, INVESTCORP Land Thanh Hoa Company Limited has completed the construction of 100% of the surface water drainage system and underground electrical lines; installed lights in the campus and completed the installation of quote stones and the nameplate with Thanh Hoa green stone. In addition, the installation of natural stone sidewalks, flower beds and box steel railings around the lake has reached 90%. The works are nearly completed, including: paving the internal road and courtyard with Terrazzo tiles and paving the steps up and down the lake with natural stone reached 80% of the volume; the renovation of cultural houses and public toilets reached 70% of the progress.
Construction progress updated in December 2021– Manufacturing eco-friendly decor product project

Construction progress updated in December 2021– Manufacturing eco-friendly decor product project

Although the situation of the Covid-19 pandemic in Bim Son town in December 2021 continued to be complicated, there were large outbreaks and complicated changes in the community, INVESTCORP 15 ensures the effective implementation of the "dual goal" of preventing and controlling diseases, protecting the health of engineers and workers, and ensuring the construction progress and completing the project plan.
Construction progress updated in December 2021 – Typical Residential Area Infrastructure Project in Hoang Hoc Village, Dong Hoang Commune, Dong Son District, Thanh Hoa Province

Construction progress updated in December 2021 – Typical Residential Area Infrastructure Project in Hoang Hoc Village, Dong Hoang Commune, Dong Son District, Thanh Hoa Province

At the end of December 2021, INVESTCORP Land Thanh Hoa Company Limited has completed 90% of K95 embankment, 80% of K98 embankment, 60% of grade 2 crushed stone road construction, 40% of curb installation, 45% of surface water and wastewater drainage systems. Besides, the volume of trees on the sidewalks has also been planted by 50%.
Construction progress updated in December 2021 – Star Villas project

Construction progress updated in December 2021 – Star Villas project

In Yangon - Myanmar, in the face of political upheavals and impacts from the Covid-19 pandemic, INVESTCORP Myanmar still tries to overcome difficulties, challenges, and strives to ensure the construction progress on schedule as well as ensure the safety of all employees and workers.
Construction progress updated in November 2021 – Renovation and improvement project of Thanh Quang Park (historical site of lamp factory), Ba Dinh ward, Thanh Hoa city

Construction progress updated in November 2021 – Renovation and improvement project of Thanh Quang Park (historical site of lamp factory), Ba Dinh ward, Thanh Hoa city

In November 2021, at the Renovation and improvement project of Thanh Quang Park (historical site of lamp factory), Ba Dinh ward, Thanh Hoa city, INVESTCORP Land Thanh Hoa has completed all the demolition of the existing infrastructure, installed stone curbs around the park, planted large trees in the campus and demolished the old coat of public toilets’ walls.
Construction progress updated in November 2021 – Manufacturing eco-friendly decor product project

Construction progress updated in November 2021 – Manufacturing eco-friendly decor product project

In November 2021, INVESTCORP 15 has completed the construction of all concrete floors for factories and office buildings. Concrete for the deck, dock floors No. 1 and stairs have also been completed in November 2021. The walls of the factory, office, and power room have also been done.
Construction progress updated in November 2021 – Typical Residential Area Infrastructure Project in Hoang Hoc Village, Dong Hoang Commune, Dong Son District, Thanh Hoa Province

Construction progress updated in November 2021 – Typical Residential Area Infrastructure Project in Hoang Hoc Village, Dong Hoang Commune, Dong Son District, Thanh Hoa Province

At the end of November 2021, INVESTCORP Land Thanh Hoa continues to implement the work items of the Typical Residential Area Infrastructure Project in Hoang Hoc Village, Dong Hoang Commune, Dong Son District, Thanh Hoa Province and has completed to 90% of the K95 soil, 70% of K98 soil and 70% of low voltage electric poles. In addition, the construction of surface water drainage system and the construction of crushed stone type 2 are also being implemented in parallel.
Construction progress updated in November 2021 – Dong Nam Residential area infrastructure project in Dong Khe commune, Dong Son district, Thanh Hoa province

Construction progress updated in November 2021 – Dong Nam Residential area infrastructure project in Dong Khe commune, Dong Son district, Thanh Hoa province

In November 2021, Dong Nam Residential area infrastructure project in Dong Khe commune, Dong Son district, Thanh Hoa province continued to be executed laying underground electrical cables, tiling sidewalk and demolishing temporary road to return the site to the Investor by INVESTCORP Land Thanh Hoa Company Limited.
Construction progress updated in November 2021 – Star Villas project

Construction progress updated in November 2021 – Star Villas project

In November 2021, the situation in Myanmar continued to be complicated with protests and riots taking place more often, however, INVESTCORP Myanmar still tried to continue the construction and completion of the Star Villas project as per the primary objective.
Construction progress updated in October 2021 – Project of Repairing damage of roadbed, road surface and drainage system section Km3+00 -:- Km10+500, National way 47B, Thanh Hoa province

Construction progress updated in October 2021 – Project of Repairing damage of roadbed, road surface and drainage system section Km3+00 -:- Km10+500, National way 47B, Thanh Hoa province

In October 2021, the project of Repairing damage of roadbed, road surface and drainage system section Km3+00 -:- Km10+500, National way 47B, Thanh Hoa province has been implemented and completed by INVESTCORP Land Thanh Hoa 100% of asphalt concrete, 95% of the drainage system and is currently carried out casting safety poles.
Construction progress updated in October 2021– Manufacturing eco-friendly decor product project

Construction progress updated in October 2021– Manufacturing eco-friendly decor product project

In October 2021, the Manufacturing eco-friendly decor product project has been completed the construction of concrete lining of the factory ground, the concrete roof of power room, the concrete walls of chemical house and walls on the 2nd floor of the office building. Currently, INVESTCORP 15 is implementing the construction of the 3rd floor walls of the office area and construction of 90% of the concrete works for the factory ground.
Construction progress updated in October 2021 – Yi Da Garment Factory Project Phase 3 - Canteen parking

Construction progress updated in October 2021 – Yi Da Garment Factory Project Phase 3 - Canteen parking

At the end of October 2021, INVESTCORP Dong Minh has completed all construction items of the Yi Da Garment Factory project Phase 3 - Canteen parking and carried out acceptance to handed over the project to the Investor to put into use.
Construction progress updated in October 2021 – Typical Residential Area Infrastructure Project in Hoang Hoc Village, Dong Hoang Commune, Dong Son District, Thanh Hoa Province

Construction progress updated in October 2021 – Typical Residential Area Infrastructure Project in Hoang Hoc Village, Dong Hoang Commune, Dong Son District, Thanh Hoa Province

In October 2021, INVESTCORP Land Thanh Hoa continues to implement the work items of the Typical Residential Area Infrastructure Project in Hoang Hoc Village, Dong Hoang Commune, Dong Son District, Thanh Hoa Province such as construction of drainage system, gathering and distribution of crushed stone to the construction site, casting prefabricated concrete components for the drainage system and electrical system etc.
Construction progress updated in October 2021 – Dong Nam Residential area infrastructure project in Dong Khe commune, Dong Son district, Thanh Hoa province

Construction progress updated in October 2021 – Dong Nam Residential area infrastructure project in Dong Khe commune, Dong Son district, Thanh Hoa province

At the end of October 2021, in the Dong Nam Residential area infrastructure project in Dong Khe commune, Dong Son district, Thanh Hoa province, INVESTCORP Land Thanh Hoa has completed the construction of asphalt concrete for 9000sqm of roads and 75% of sidewalk paving.